OT Cyber Readiness

OT Cybersecurity Assessment & Readiness for Industrial Environments

Strengthen OT Security in 90 Days – Without Downtime

Readiness in 90 days

Operational Technology (OT)- the control systems that run buildings, plants, and critical services-now sits squarely in the blast radius of ransomware and nation-state activity. This page outlines a pragmatic, zero-downtime 90 day sprint to achieve asset visibility, prioritized risk reduction and practiced incident response-fast.

Why Rapid OT Assessments Now

  • Visibility gaps: Unknown controllers, vendor laptops, and engineering workstations.
  • Patch constraints: Safety and uptime requirements limit traditional scanning and patching.
  • Remote access sprawl: VPNs, vendor jump hosts, and unmanaged modems.
  • IT–OT convergence: Historians, BAS, and energy systems bridged to IT.
  • Rising expectations: Auditors, boards, and insurers demand evidence.
  • Adversary tradecraft: Abuse of legitimate tools and OT protocols.

What “Rapid” Looks Like

Passive First

Asset discovery using taps, SPANs, and logs—no disruptive scanning.

Zero Downtime

Change-controlled improvements aligned with vendor guidance.

Crown-Jewel Focus

Protect safety-critical processes and loss-of-control pathways.

Evidence by Default

Artifacts mapped to NIST 800-82, IEC 62443, and CISA CPGs.

The 90-Day Sprint: Discover → Defend → Drill

Phase Key Activities Deliverables
Discover (0–30) Passive asset discovery, communications mapping, hygiene quick wins Authoritative inventory, risk register, backup validation
Defend (31–60) Segmentation, allow-lists, remote access hardening, detections Enforced rulesets, ATT&CK-mapped alerts, restore reports
Drill (61–90) Incident playbooks, tabletop exercise, metrics & evidence Executive scorecard, audit-ready evidence packet

Sector-Specific Nuances

  • Federal Facilities: BAS inventories, vendor access windows, BACnet allow-lists.
  • Electric & Gas Utilities: Control-center baselining, remote ops hardening.
  • Airports: Baggage and fueling segmentation, contractor laptop isolation.
  • Data Centers: Power and cooling pathways, hardened remote-hands workflows.

Outcomes & Metrics

  • OT asset coverage and reduction of unknown devices
  • Risky exposure pathways removed
  • Remote access governed with MFA and session recording
  • Successful offline backup restores
  • ATT&CK for ICS detection coverage

Standard Alignment

  • NIST SP 800-82
  • IEC 62443
  • CISO Cross-Sector Performance Goals
  • MITRE ATT&CK® for ICS

Free OT Rapid Readiness Consult

Leave with a 10-point readiness score, your top three risk-reduction moves, and a sample incident checklist.

Our Experience

Let's talk about your project

We can help you define your requirements, develop your roadmap, or implement your solution.